Daily Life
Home Appliance Delivery and Installation in China: A Guide for Foreign Residents
Plan appliance delivery and installation in China with checks for access, dimensions, utilities, installers, testing, packaging, invoices, and warranties.
Rules and procedures can change. Check the linked official sources before acting on time-sensitive information.
Quick answer
What you need to know
A practical workflow for getting large home appliances into a China apartment, installed safely, tested, documented, and covered by clear service records.
- Measure the entire delivery route and confirm building access, lift rules, parking, and protective materials.
- Check utility connections and landlord approval before the appliance arrives.
- Verify the delivery team, installation scope, extra charges, serial number, and condition before signing.
- Test core functions, keep packaging temporarily, and save invoices, manuals, warranties, and service records.
Buying a refrigerator, washing machine, dryer, dishwasher, water heater, or other large appliance is only half the job. The delivery route, building rules, utilities, landlord approval, installer scope, and acceptance record determine whether installation is smooth and whether later warranty claims are easy to prove.
Measure from the street to the final position
Record appliance dimensions with packaging and without it. Measure the building entrance, security gate, corridors, turns, lift door and cabin, apartment door, interior corners, and final clearance. Check whether the appliance can remain upright as required by the manufacturer.
Ask property management about delivery hours, vehicle access, freight-lift reservations, floor and wall protection, deposits, and packaging disposal. For complex moves, the moving company and elevator booking guide has a useful access checklist.
Prepare utilities and permissions
Compare the manufacturer’s specifications with the actual outlet, voltage, circuit capacity, grounding, water inlet, drain, ventilation, floor strength, wall, and shutoff access. Do not assume an old connection is safe or compatible. Obtain written landlord approval before drilling, changing cabinetry, modifying pipes, or altering landlord-owned wiring.
China’s State Administration for Market Regulation provides official product and consumer information at samr.gov.cn. For electrical, gas, structural, or water-heater work, use a qualified provider and confirm local property requirements rather than relying on a casual workaround.
Control delivery and installation scope
Before arrival, confirm order number, model, color, serial-number process, team identity, appointment window, included installation, standard materials, haul-away, extra-charge menu, and complaint contact. Keep pets and children away from the route and protect valuables.
Photograph the sealed package, product label, serial number, exterior, accessories, and any damage. Match the model to the order before installation. Do not sign a clean acceptance if damage, missing items, or an unauthorized substitution remains unresolved.
Test, document, and monitor
Follow the manufacturer’s settling time before powering a refrigerator or similar appliance. Ask the installer to demonstrate shutoffs, filters, drainage, leveling, controls, and normal sounds. Test water connections for leaks and run the approved basic cycle or startup check.
Save the invoice or fapiao, delivery record, installation sheet, serial number, manual, warranty, photographs, and service contacts. The appliance repairs and warranties guide explains how to preserve a useful claim file.
Appliance installation checklist
- Measure the appliance, packaging, delivery route, and final clearances.
- Reserve building access, lift time, parking, and protective materials.
- Verify power, water, drain, ventilation, floor, and shutoff requirements.
- Obtain landlord approval for any property modification.
- Confirm delivery team, installer, included work, and possible extra fees.
- Photograph packaging, labels, serial number, condition, and connections.
- Test operation, leaks, controls, noise, and stability before sign-off.
- Keep invoices, warranty records, manuals, and service contacts.
This is general household and consumer guidance, not electrical, gas, plumbing, structural, legal, or product-safety advice. Follow the manufacturer’s instructions and confirm work with the landlord, property manager, seller, authorized installer, utility provider, or another qualified professional.
Frequently asked questions
Common questions
Are delivery and installation usually the same appointment?
Not always. The seller, courier, brand installer, and building contractor may be different parties. Confirm who performs each step, when they arrive, and which charges are included.
Can an installer modify plumbing, gas, or electrical connections?
Only allow work within the person's documented authorization and competence. Structural, gas, high-load electrical, or landlord-owned utility changes may require separate approval and qualified providers.
Should I discard the packaging immediately?
Keep it until the appliance passes the agreed inspection and return window, if space and building rules allow. Photograph labels and damage before packaging is removed.
What if the appliance does not fit?
Stop before forcing it through a doorway or modifying the apartment. Document the measurements, contact the seller, and confirm return, exchange, redelivery, and fee terms in writing.